Multi-product production needs a clear changeover brief. Compare the supported liquids, package sizes and closure systems with the time and work each transition requires.
- Which product and container combinations have been run?
- Which change parts and cleaning steps are required between products?
A format matrix for multi-product beverage lines
List every intended product, container and closure combination. Mark demonstrated combinations and those that require new parts or further review. This matrix makes flexibility visible and prevents one successful product run from being mistaken for universal compatibility.
Define the application
Record product, container material and size, closure, nominal speed, format range, utilities and available floor space.
Compare like with like
Separate the machine itself from optional conveyors, change parts, controls, manuals, guarding, inspection systems and spare parts.
Build the delivered cost
Include inspection, dismantling, packing, loading, transport, duties, installation, modifications, validation and production start-up.