Plan the change between the actual light and dark plant-based beverages before choosing a shared line. Ask quality to define the test method and what is acceptable for the first pack after changeover. Record the sample order and where each sample comes from. Follow the site’s approved cleaning and change procedure.
Read samples in order through the handoff
Start with an approved reference from each beverage. Take authorised samples at the agreed line points and link them to the previous recipe, next recipe and event time. Where colour persists, retain the first affected sample and document its location before asking the supplier what equipment path needs review.
| Sample | Record | Quality result |
|---|---|---|
| Before the change | Approved previous and next reference | ___ |
| After the agreed transition | Time, location and sample code | ___ |
| First accepted pack | Result and release decision | ___ |
| Affected held output | Quantity, location and disposition | ___ |
Map the evidence needed for a multi-product changeover
Compare a used line for both products
Share product descriptions, packaging and the first-pack release checks.